Skip to main content

Troy Lee Designs FLOWLINE SHORT

Troy Lee Designs FLOWLINE SHORT
  • Color: blk
  • Color: blk
  • Color: charcoal
  • Color: charcoal
$68.00 - $85.00
$85.00
Color: blk
Size: Select size
Please select options Unavailable

Details

DETAILS
FLOWLINE SHORTS
Flowline is our latest addition to the MTB category, incorporating our best technical innovations in a comfortable, technical, yet affordable kit. Flowline trail shorts are aimed at the enthusiast mountain biker with minimalist features, but the quality, fit and feel you expect from Troy Lee Designs

SPECIFICATIONS
Ride Fit
Blue Sign Certified Mechnical Stretch Woven Fabric
Optimal 2 Deep Hand Pockets
Self-Fabric Waist Adjusters
Zipper Fly with Snap Closure

Part Numbers

Option MPN Store SKU
blk / 28 245786031
blk / 30 245786032
blk / 32 245786033
blk / 34 245786034
blk / 36 245786035
blk / 38 245786036
blk / 40 245786037
charcoal / 28
charcoal / 30
charcoal / 38 245906036 CTL23201+010
charcoal / 40

Reviews